One driveway company said they put down the base and then I have to drive on that for two months before they lay the asphault. Is this the correct way? No other company said they do this.





Answers:



From: Summit Paving

Probably because they dug it up with a skidsteer and boiled up all the ground water and made the subgrade go soft. Time will heal that.


Back

Add Your answer to this question:

Your name
Your answer
Confirmation code:804 Enter the code exactly as you see it into this box.


Powered by Yahoo! Answers



$Top Products
Heavy-Duty Shovel - Long Handle» Heavy-Duty Shovel - Long Handle
Price: $79    $65.99
Paver Lights 14 Pack» Paver Lights 14 Pack
Price: $234    $195.00
Paver Lights 8 pack» Paver Lights 8 pack
Price: $198    $165.00


?Questions & Answers
Resolved questions:
» Any recomendations on a tack that does not need to be heated, can be applied cold with some type of spray system
» Are there any toxicity concerns when living next 2 a newly paved road?
» How can I cover the surface scrapes from snow removal on our new asphalt driveway? Can I use flat black paint?
New unresolved questions:
» What is the shrink factor for concrete asphalt
» Can a drive way be grafted with out issues
» What air temperature is too cold to have a contractor lay an extention to a residential driveway?